Wednesday, May 10, 2017



WEEKEND DUTY
FANSHAWE CAMPUS
    NICK  -  JORDAN  -  EASTON
MARCH 31ST, APRIL 1ST, APRIL 2ND 2017

Friday, March 31, 2017
On Friday march 31st at 8:00 we started our day out by doing a walk around of the areas on the front of the campus where were to do work that weekend. After the rounds were done we then began the first task at hand which was to clean and prep the ground which needed to be mulched. The front of the campus was in need of some spring cleaning.  To accomplish more we split the front campus tasks in to two and worked out way to meet in the center. We first gathered all of the equipment that was need for the day, and then we loaded up the RTV’s and the trailer for the dead foliage and debris. Once everything was ready we then started cleaning out the beds of any leafs, garbage and debris. The small trees and shrubs that needed to pruned received a pruning then from there the rest of the beds had leaves racked out to make room for the mulch that was to go in. After using the leaf blower to remove the needles from under the baled cypress Mr. Pascoe came by for a visit and asked us to divide the Yucca filamentosa ‘Golden Sword’ and then spread it in the bed. Later on we then had to tie up the grasses to make it easier for them to then be cut down. We tied up the grasses in the front garden beds and cut them using the hedge trimmer.  Once it was cut and in piles, they were loaded on to the trailer and brought out to the compost pile and this was repeated until the end of the day so we could start mulching right away the next morning.
  
Saturday, April 1, 2017
On Saturday April 1 we started the day by doing the greenhouse call to sign in for the day. Next we loaded up the RTV`s with some shovels and headed out to the Fanshawe sign. What we had to do at the Fanshawe sign was move 5 Beauty Berry`s from the front of the sign to the back because they were getting to big and blocking the spotlights that illuminated the Fanshawe logo. Once all of the beauty berries were moved to the right place and planted, we then proceeded to edge the garden beds in the front so that they will hold the mulch better without the mulch sliding out of the beds over time. Once the beds were edged the mulching began we went from the right hand side of the school and gradually moved along the school to the left side. We did this until the day was over.  

Sunday, April 2, 2017

On the final day, Sunday April 2, 2017, the team started by heading out to complete the mulching from the day before. We moved the mulch and spread it throughout the garden beds located by the main door and also the freshly planted tulip bed. Sean brought the mulch by tractor/trailer and the rest of us helped move the mulch to the inside of the gardens. There were lots to do so it took the fair portion of the day to complete all the garden beds. We worked hard so it gave us some time to clean up  the pathways of mulch and also to do some detailing in some of the beds. Easton also took the chainsaw out and cut some Viburnum stubs that needed to be cut back. We made sure to clean all the tools so they were in the same condition as we found them. We then made sure the tractors, RTV, and trailers were clean and ready to be put away. We locked up everything then proceeded to the greenhouse to finish the last task of the weekend… The Blog.  Overall a great weekend of hard work, lots accomplished!




Weekend Duty
March 24th – 26th, 2017
Lexi Drenth, Mike Dobie & Dakota Stephens


            Friday morning, Dakota and Lexi met with greenhouse Jeff to review our duties for the weekend. Jeff wanted to walk around with the greenhouse crew first so he sent Lexi and Dakota to go get the tractor and trailer and perform a circle check on both. After they completed that we went back to the greenhouse to see Jeff. We were just starting to walk around with Jeff when Mike Dobie came out and joined us after his plant identification class. Jeff showed us our area, what needed pruning and how to properly do it. We got assigned the gardens that wrap around the building starting at the corner of M building and all the way to the Registrar’s Office. We also got assigned one plant to prune on our own which we would be graded on how we did. We all started by getting the proper tools they needed. Dakota got started on a separate garden from Lexi and Mike but we were all within close proximity. Mike and Lexi were tying up grasses that were going to be cut back. Dakota was working on cleaning debris out of a garden and sidewalks first and then he was going to start pruning his shrub. We worked for about an hour and a half then they broke off for lunch. After lunch, Lexi, Mike and Dakota got split up into different jobs in preparation for the College's open house tomorrow. Dakota cleaned out the tractor bay, Mike cleaned out the tool room and Lexi took the Kubota trailer around the school property and took out all of the squirrel covers in the planters. That took us to the end of the day. We put our tools away and cleaned up any messes and then signed out for the day.

            Saturday morning was really busy due to the open house for the College. We pruned for part of the day and worked away in the beds. Mike Pascoe came out and walked with us through the gardens at M building.  Some of the plants that they had to prune were Oakleaf Hydrangeas, dead branches off trees, Forsythias and Malus trees. We were all working closely together so everybody had an idea of how to prune things properly. 





Since it was the open house the College bought lunch for the volunteers that were helping with the open house so all three of us got a free lunch. After lunch Mike took care of all the Oakleaf Hydrangeas, Dakota pruned the trees and Lexi edged garden beds so the mulch would stay in the gardens when it rained. As we moved along, all the debris was brought back to the compost pile. We were told to leave the leaves in the garden beds but we raked the leaves out of the middle of the Junipers and spread them elsewhere in the beds. The rest of the day went by really fast. 


            Sunday morning, everyone got to work right away. We were ready to have a full days worth of work when they realized that they were missing a key to operate the tractor, so there was more running back and forth before we got started on our day. Once we got started, Dakota was in charge of getting mulch with the two tractors. We mulched all morning making the beds looking finished. 




After finishing the first garden bed at M building we cut back the grasses in front of the bookstore. At the end of the day we blew off the areas we worked on and made sure all the tools and equipment were cleaned along with the tool room. After everything was done and cleaned properly, everyone signed out and went home for rest before class on Monday. 




Weekend Duty Blog
March 31st-April 2nd 
Caitlin McPhee and Sean Fitzpatrick


Friday March 31st

Sean and I arrived at the Fanshawe college greenhouse bright and early ready for the beginning of weekend duty, where we met Jeff Rowley, the resident greenhouse technician. We began by going for tour of the campus to see what tasks we would be assigned for the weekend. Unfortunately the weather was not very pleasant out, as the rain fell when we walked through campus with Jeff and another weekend duty crew, Easton, Jordan and Nick who also were being debriefed on what tasks they would be working on and even though the rain fell our spirits were high with excitement . Sean and I started by the Office of the Registrar where we started tying up ornamental grasses so they could be cut back later that day. We broke for a quick healthy break back at the greenhouse with our classmates and then began to work on the same garden. The day was going by fast and before we knew it we had pruned the beautiful Redbud, the Dwarf Lilacs and cut all of the grasses back to 6" in height. We had the opportunity to help Lucas, the Cuddy Gardens Farms technician and Jeff unload the new potting machine from the trailer and into the greenhouse tractor bay. After lunch Sean and I moved on to cut back the tall grasses. Sedums and Salvias were also cut back and we pruned the Hydrangea paniculata 'Limelights'. We finished the day by weeding the gardens of dead foliage and cleaned up any debris so we would be ready for mulching and edging on Saturday morning.


Saturday April 1st

Sean and I arrived for an early cold and wet start to the day. We met up with the rest of the crew, did our equipment circle checks, clocked in with Jeff and then grabbed our equipment needed for the day. First we relocated the Calicarpa dichotomas at the front of the sign by the Fanshawe College Boulevard entrance to the back side of the sign as they were blocking the College logo on the concrete pillar. Following that we mulched and edged for the rest of the afternoon in our areas. We also put a snow fence up out front to prevent foot traffic through the garden as people were crushing the emerging tulips. Sean pulled the trailer on to the sidewalks and dumped loads of mulch while the rest of the crew used buckets and wheel barrows to disperse it in the beds. By the time the mulch pile was spread another load was coming. We did one last load before calling it a day so we had a full load of mulch when we arrived the next morning. All our tools and equipment were put away as we signed out and took off.




Sunday April 2nd


We arrived on Sunday to some beautiful sunshine and warm temperatures. The horticulture squad was ready to begin mulching because this was the only task we had to finish. Not much was different from Saturday as loads of mulch were dumped and spread across the many gardens in the H-M-F-E loop. We finished mulching everything in the loop including the boulevard trees after our last break. We than dedicated the last few hours of our shift to clean all the pathways and fluff up the grass and mulch throughout our work site. We used backpack blowers and rounded up all the plant debris into the dump trailer. Sean than did a final compost run and cleaned out the tractor and trailer. Caitlin and Sean took the two tractors back to the C building and locked everything up. We then cleaned all the tools and put them away in their respected positions. That wrapped up our weekend.




Thursday, April 13, 2017

Weekend Duty Blog
By Easton Klaudi and Dakota Stephens
Friday April 7th 2017
On Friday our entire class was completing our practical CLT exams as part of the new and improved industry standards. We were busy that morning preparing the greenhouse work before the events of the day.  We filled 2000 4” pots with media in one hour and thirty minutes by hand. We have the brand new potting machine up and running but innate human spirit drives us to beat the machine. We now know the machine has to beat an hour and that we feel we can too! We also set three different sticky traps in attempt to monitor pest levels in the greenhouse. We then headed off to Cuddys in Strathroy for our final Certified Exams.  The CLT exams were a great experience for most of us; there had been snow in the morning but the day ended in pure sunshine. We filled our bellies and returned for one final hour of power in the greenhouse for the day. We filled more 4” pots with media and did some afternoon watering and maintenance. We closed the greenhouse for the night.






                                                                              

Saturday April 8th 2017
On Saturday morning, we arrived at the greenhouse ready to work during a beautiful day. We began by opening up the greenhouse and going through the opening checklist. Temperatures were optimal and there were no signs of major problems. We then performed the required watering (Seedlings, Petunias, geraniums etc.) We fertilized all the annuals in the greenhouse. We then finished preparing the rest of the 4” pots for Wednesday’s class. Easton also pinched the chlorotic leaves of the Petunia baskets to improve the aesthetics and to obviously keep the foliage color as uniform as possible.  We then moved on to planting the vegetable seeds that Lucas brought in to sell at the Cuddy’s Open Garden in June.  We watered them and covered with plastic domes to help retain moisture during germination.  We decided to begin moving cuttings from the propagation chamber to 4” pots. Dakota began to do some cleaning around the Greenhouse to help decrease the possibility of pests and diseases as fungus gnats were found flying in the main instruction area. We then worked on some stock basket cuttings, moving them from trays to 4” pots. Some of them did not have enough root growth so they remained in the propagation chamber until they are ready. We also had to water the seedlings in the greenhouse again because it was so sunny out and they began to dry from the increased rate of transpiration.
Sunday April 9th 2017
      Sunday morning saw us return for the third and final day of our greenhouse duty. We opened the doors and made our phone call to Jeff Rowley to let him know we were getting ready for action. Our red and white Petunias growing in baskets (to celebrate Canada’s 150th anniversary) are preparing themselves vigorously to bloom for the historic celebrations. For 150 years we have developed and reshaped this nation. Canada has a rich history both in peace keeping globally as well as the trade of our natural resources and of course our world renowned maple syrup from Canadian Sugar Maple trees. When it comes to our waving flag and our blooming flowers we want the white and the red to glow in honor of our heritage. We used two types of fertilizer this weekend, 350ppm formula, for our petunias to grow, as well as 200ppm 20-20-20 stock basket solution for stock plants and the Alocasia plants. Quickly we went inside the school with our watering tanker to care for the plants in front of the book store and the library. We checked our propagation chamber to find a few of our specimens were well rooted and ready for a 4” pot. We mixed in our standard Pro mix HP mycorrhizae with just some good clean water and made sure to transfer the numbers in our records from the propagation chamber quantities to the 4” pot quantities. Plants can easily get lost, stolen or damaged so proper tracking keeps proper records and our program coordinators happy. We used our E.C. and pH reading technology (pH- 6.4, E.C= 2.1) to ensure the petunias were being cared for properly and we cleaned the leak out of the container it all came in… people need to be a little more careful when putting things away, but we all need to finish the work we find before stopping the day. We have to look after each other, care about each other and we have to bloom together.


 




The Horticultural Technician program was a great experience; people taught each other how to stand together and how to chase dreams. In my early twenties with a joyful tear in my eye we finished our final Fanshawe horticulture blog post and see the future in front of me. Thank you all.





Thursday, April 6, 2017

Greenhouse duty
Liam and Ben

March 31, 2017

It was a gloomy spring morning when Ben and I entered the greenhouse. We began our duties by completing our daily check list and walking the crop. We spot watered all plants and used both 200 ppm and 350 ppm fertilizer for petunias, stock baskets, Alocasias and annual Geraniums. We then took a walk through the greenhouse where Jeff pointed out tasks that we could add to our list. After our break we began to sow all sorts of vegetable seeds as well as make labels for plants. 




After lunch we got right back at it and we had the task of helping Mike Pascoe and Lucas bring in some soil as well as take down horticulture displays for the apprenticeship graduation that happened today.




We also set out bug traps for our pest monitoring report. We continued our day by walking around the school observing the interior plants that we needed to maintain during the weekend. We also trimmed back olive trees and changed the sign outside. Other small tasks that we completed were organizing stock plant baskets, opening and closing the POS system and watering seedlings.



April 1, 2017

As we woke up and headed to our weekend greenhouse duty we knew today was going to be a good day as the sun was shining and the birds were singing. We began our weekend duty by completing our daily check list as well as a thorough walk of the crop where we noticed that we needed to water the seedlings in the greenhouse.  We then decided it was time to deal with the interior plant tasks that Jeff had left for us. This included planting up some Pothos and Ficus as well as watering with the Aquamate. 




We made our way to T building to plant Pothos in the common area then on our way back we stopped at M building to plant more Pothos. After break we were able to do EC readings and Ph readings. Shortly after, we began selecting plant from the stock baskets to cut back. After lunch we selected all baskets and trimmed them back. Then we watered the crop (seedlings) and did a walk through. To finish off the day we washed pots and did a walk of the crop, cleaned and washed all surfaces, watered seedlings and checked the propagation chamber.

April 2, 2017

Today was a good day. It was forecasted that it would be sunny so we were ready for a great day. We started out morning with our usual check list. Shortly after that we did our walk of the crop where we spot watered seedlings and stock baskets. We also watered the hanging stock baskets with 200 ppm fertilizer using the irrigation system. There were also some baskets that needed to be cut back as we missed them yesterday. Then we began to clean the tractor bay which included organizing pots and tools, cleaning the floor and organizing the letters associated with the sign.




We also vacuumed off all surface and shelves. After break we did another walk of the crop and cleaned out the drains. At this time we also had to water seedlings again.

After lunch we decided it was a good idea to also clean the pots located in the hallway in the loft shelf and organize them. There were also a lot of large clumps in the media that had to be broken up. We then checked the mist system and gathered our pests for our pest monitoring report. After completing a thorough monitoring report we then did another walk of the crop to ensure things were good and everything was watered. After filling the propagation chamber with water we then began to wrap our weekend at the greenhouse by cleaning all surfaces and putting away all tools that we used.


Tuesday, March 28, 2017

Weekend duty blog - March 24-26, 2017

This Saturday was Fanshawe’s Open House. This is an exciting event for Fanshawe to show off programs to prospective students. Because of this event there was quite a few extra tasks that needed to be accomplished this weekend.

Friday

Friday was a big day for Julian and I. We started our day with the opening checklist and walking the crop. We needed to water all Hydrangeas, hanging stock baskets, perennial Geraniums, and seedlings. We also potted up and cut back annual Geraniums. The Technology department at Fanshawe contracted us to pot up Sansevieria plants in planters they had build for an experiment they are conducting. They are trying to see if adding plants to a room will improve the air quality. These planters were made of wood with medal liners. They were very heavy and quite difficult to wheel through the school on large racks. Both of us were sweating profusely by the time we made it to the opposite side of the school.  In the last hour we tried to clean up for open house. This consisted of reorganizing the Hydrangeas, washing the floors and making sure the benches looked clean. There was so much to do we didn’t get to the massive pile of 4’’ pots that had been left by the sink from the classes that week. We did however put them in the sink to soak overnight so they could be cleaned first thing in the morning. It was overall a good day and we got a lot done.

 Saturday

Saturday began by getting everything ready for open house. We needed to ensure the greenhouse looked clean and orderly. Julian washed all the pots left from the week, while I cleaned to potting room floors and organized under the table. Some first year students volunteered to help with open house and they arrived around 9:30 am. I got them helping with making petunia hanging baskets. They were quite efficient and with that many people helping it made it go by very fast. While that was going on Julian was seeding Salvia. At 10:40 am I had to leave the greenhouse to do a radio interview to promote our program. Julian also had to do an interview but later on in the day. We sold the last of the Hydrangeas just an hour or so before the open house ended. I was nice to see the last of the Hydrangeas get sold. People seemed to love them this year. Once open house was over we still had 3 hours left in the day. We used this time to put a new heat mat in the propagation chamber, make tip cuttings, add Begonias to inventory list, and fix the sign outside to read  “Hydrangeas Sold Out”. In the last hour of the day we also ensured the interior Ficus’s were watered. It was a hectic day with people coming in and out of the greenhouse constantly, but we made the best of it and got a lot of work done.




Sunday

Sunday was our last day in the greenhouse. We started our day by doing the opening check list and opening the cash. After that Julian washed the remainder of the pots, while I walked the crop and watered any plants that were dry. A big task we had to get done was hanging up some of the stock baskets to make some room for seedlings on a bench. Once all the baskets were hung, we laid out two heat mats on bench 3 and put the seedlings on them.  Once that was all done we met up with the maintenance crew for lunch. After lunch I washed the floors of the greenhouse while Julian seeded 7 tray of Dusty Miller. Mike Pascoe also asked us to seed some Snow Gum for him so we did one tray. While talking to Mike Pascoe the day before, he told us that the seeds were from Australia and he got them as a gift. We were running low on potting soil so after all our tasks were done we mixed up some soil for the week ahead.                         







Overall it was a great weekend. Julian and I worked great together. We got all jobs done that were assigned to us and also met a lot of nice people at open house. We worked hard all weekend and it paid off. 








Monday, March 27, 2017

On Friday March 17th 2017 Michael Aspden walked the entire crop, determined what needed to be watered. Everything needed to be watered so we did, with the proper fertilizer mixes. While Michael was walking the crop I was opening the cash register and counting the opening float with Jeff. After I finished counting the float with Jeff, I completed the opening checklist for the day. After Michael watered everything including the seedlings on the heat bed with. We then proceeded to start potting up the petunia seedlings from the seed trays. We completed about 3 or 4 full trays of 24 seedlings, put them in the greenhouse and watered them. After watering and filling up the trays with petunias we took a short break. After our break we went with Jenn to the B cafeteria, when we were there she told us everything that she wanted done. This included taking out some ficus trees and repotting them and replacing them with Dracaenas and Pothos and to spray one with isopropyl alcohol to treat for mealy bug. After that we went back to the greenhouse where Jeff taught us how to make fertilizer for the hydrangea crop. When everything was watered and potted up I closed the cash register and completed the closing checklist, while Michael washed the floors.

On Saturday March 18th 2017 Michael walked the crop to see what needed to be watered. He then began watering the white, pink and tivoli hydrangeas with the proper fertilizer solution. He watered them for about 25 minutes. After that he watered the stock baskets, hanging baskets, petunias, mother in law’s tongue, pothos and elephant ears with the stock basket fertilizer solution. While Michael was watering, I was opening the register and doing the morning checklist making sure that everything was in line. After that when everything was watered we took a break. After our break we continued potting up the petunia seedlings, after filling 10 or 12, Michael walked the crop and determined if anything needed to be watered. The blue hydrangeas did, so he turned the dosatron on with the blue hydrangea fertilizer solution and watered them for about 25-30 minutes. While Michael was watering the hydrangeas, I was still potting up the petunias. After everything was watered Michael walked the crop and took an inventory of anything that was in a four inch pot. He transferred the information to me and I added it to the google spreadsheet. After that we had our lunch break. After lunch we came back to the greenhouse and walked the crop again. Seeing if anything needed to be watered. We figured that the white, pink and tivoli hydrangeas needed to be watered because of the time we watered them on Friday. After that we proceeded to consolidate all of the hydrangeas to make more room for other plants. That took us the rest of the day and after I closed the register and completed the closing checklist while Michael washed the floors.

On Sunday March 19th 2017 we began the day by opening up the register and completing the opening checklist. After that we walked the crop and watered what needed to be watered. After watering everything we went and completed the tasks that Jenn set out for us. We went over to B cafeteria, with the dosatron and all the tools and plants (Dracaena and Pothos) we needed, but it was locked. So Michael and I split up, I went to talk to security to get the place open while Mike went back to the greenhouse to grab some soil to bring back. I then began to take out all of the plants that Jenn told me too, and repot them with dracaena and pothos while I was doing this Michael was following me with a broom and the dosatron, watering and sweeping up after me. We then took back the ficus trees and potted them up in the proper containers. After finishing this we took our morning break and lunch at the same time because we worked past our 10 o'clock break. After this we finished potting up all of the petunias, about 5 or 6 more trays. Once finished with the petunias, we started filling up all of the planters that Jeff needed with BX Potting soil. After that we took our afternoon break. When we were finished our break I began to wash all of the pots and flats for the weekend. While Michael washed the entire greenhouse floor. After that I closed the register and do the closing checklist. After all of the pots were dry, Michael collected them all on a cart and put them away in the correct places.

Ben McConkey and Michael Asdpen.