WEEKEND DUTY
FANSHAWE CAMPUS
NICK - JORDAN
- EASTON
MARCH 31ST, APRIL 1ST,
APRIL 2ND 2017
Friday, March 31, 2017
On Friday march 31st at 8:00 we started our
day out by doing a walk around of the areas on the front of the campus where
were to do work that weekend. After the rounds were done we then began the
first task at hand which was to clean and prep the ground which needed to be
mulched. The front of the campus was in need of some spring cleaning. To accomplish more we split the front campus
tasks in to two and worked out way to meet in the center. We first gathered all
of the equipment that was need for the day, and then we loaded up the RTV’s and
the trailer for the dead foliage and debris. Once everything was ready we then
started cleaning out the beds of any leafs, garbage and debris. The small trees
and shrubs that needed to pruned received a pruning then from there the rest of
the beds had leaves racked out to make room for the mulch that was to go in. After
using the leaf blower to remove the needles from under the baled cypress Mr. Pascoe
came by for a visit and asked us to divide the Yucca filamentosa ‘Golden Sword’ and then spread it in the bed.
Later on we then had to tie up the grasses to make it easier for them to then
be cut down. We tied up the grasses in the front garden beds and cut them using
the hedge trimmer. Once it was cut and
in piles, they were loaded on to the trailer and brought out to the compost
pile and this was repeated until the end of the day so we could start mulching
right away the next morning.
Saturday, April 1, 2017
On Saturday April 1 we started the day by doing the
greenhouse call to sign in for the day. Next we loaded up the RTV`s with some
shovels and headed out to the Fanshawe sign. What we had to do at the Fanshawe
sign was move 5 Beauty Berry`s from the front of the sign to the back because
they were getting to big and blocking the spotlights that illuminated the
Fanshawe logo. Once all of the beauty berries were moved to the right place and
planted, we then proceeded to edge the garden beds in the front so that they
will hold the mulch better without the mulch sliding out of the beds over time.
Once the beds were edged the mulching began we went from the right hand side of
the school and gradually moved along the school to the left side. We did this
until the day was over.
Sunday, April 2, 2017
On the final day, Sunday April 2, 2017, the team started
by heading out to complete the mulching from the day before. We moved the mulch
and spread it throughout the garden beds located by the main door and also the
freshly planted tulip bed. Sean brought the mulch by tractor/trailer and the
rest of us helped move the mulch to the inside of the gardens. There were lots
to do so it took the fair portion of the day to complete all the garden beds. We
worked hard so it gave us some time to clean up
the pathways of mulch and also to do some detailing in some of the beds.
Easton also took the chainsaw out and cut some Viburnum stubs that needed to be
cut back. We made sure to clean all the tools so they were in the same
condition as we found them. We then made sure the tractors, RTV, and trailers
were clean and ready to be put away. We locked up everything then proceeded to
the greenhouse to finish the last task of the weekend… The Blog. Overall a great weekend of hard work, lots
accomplished!
No comments:
Post a Comment