Friday, January 27, 2017

Weekend Blog
Justin and Soyoung
September 30 - October 2, 2017

            Friday afternoon Soyoung and I got our weekend duties to complete. Our duties for the weekend were to finish edging the Conifer garden that we rototilled that same week. We also had to rake the same garden since it rained the same day so it became compacted and had lots of lumps in it. We raked the entire garden to get the remaining sticks and make the soil fluffy. After that that I began to take the half moon around the make the garden as nice as possible after that the pruners came in handy for all the overhanging grass.
After the Conifer garden was completed we began to work on our major project for the weekend which was weeding and mulching a garden by the greenhouse. As we were scoping the garden bed we realised we had lots of work to do. We came up with a game plan and decided we will need a couple of buckets for the weeds and a couple hand trowels for the weeds with the big bulky roots. As we began to work on the left side of the garden we noticed that most of the slope we were working on for the first day was just covered in weeds and we knew we had a big job ahead of us. We didn’t get very far as 5 o’clock was coming up and we still has to wash the tools we were using and put the RTV away. Once that was completed we signed both of our radios and I singed out my keys. It was right on 5 so we signed out and went home for the night.
Day 2 we got to the greenhouse at 7:40 and waited to sign in to start our day. We signed and completed to circle check on the RTV that we would be using for the day. We drove over to the tool shed to get a couple of buckets a fan rake, hard rake, a couple of trowels, a few different shovels and we had our pruners. Our plan for day 2 was to get all or close to all of the weeds in the garden bed we were working on pulled and driven back to the compost pile. We were weeding for the whole day and as it reached near the end of the day we had completed 90% of the weeds being pulled. Again it was the end of the day so we cleaned our tools and put the RTV away in the shop. Signing in and out the radio and keys was a daily thing that had to be done at the beginning and end of each day.
Day 3 is the day we got to have some fun. We signed in for the day and got our radios and keys that we needed. I sent Soyoung to get the tools we will be needing for the day like a hard rake, a fan rake, a shovel, two pitch forks and two wheel barrows. While she was doing that I went to get the tractor with the trailer and complete the circle check. I drove it over to the compound and radioed Soyoung to meet me over there. Once she got there I started to unhook the trailer so I can use the tractor to fill it up with mulch. I ran into some problems trying to unhook the trailer as the jack would not crank up so I could get the ball out and drive the tractor away. Since I was unable to figure out what was going wrong I decided I would drive back to C building with Soyoung and get the second tractor. I completed that circle check and was on my way back to the compound to load up the trailer with mulch so we could start mulching the garden. Once the trailer was loaded up I drove it back to the greenhouse as it was a good place to park it so we weren’t too far away. I thought the mulching part of the job would only take a couple of hours but I was wrong it almost took all day since there were so many small places that it needed to be put down. We finished mulching at 3:45 and we began cleanup of the grounds. Seeing as mulch was everywhere we used a broom to sweep it up and shovel the left overs into low spots. We swept away all the dirt on the paths as much as we could. Now it was time to wash down out tools that we used so Soyoung was doing that I took the tractor over to the hose and sprayed it down to get the mud off the tires and floor and sprayed a little of the trailer off as it was not to muddy. I did this for both tractors and gassed only one tractor up because the other tractor was still on the full mark. They were put away as same as the tools and the RTV. We signed in our keys and radio and were done for the day.

I found weekend duty to be a very good experience. It gave me a chance to drive the tractors and get some quality experience with them. All in all our garden bed came out the way I planned it and I couldn’t be more happy. 
Weekend Duty Greenhouse Saturday October 1st
Brett Blakey and Lexi Drenth

The weekend duty jobs that we were assigned were making sure the shade curtains were being open and closed at the proper times in the day, watering the plants that needed it with the correct fertilizer, walking the crop each day to check for disease and watering issues, taking all of the stock baskets inside and pruning them back for the winter, and general cleanup of the greenhouse and potting area.

Shade Curtains
For the shade curtains we would start the opening of the curtains at 830 in the morning to end the black out period and allow light in to the greenhouse. Poinsettia crops require twelve hours of darkness to allow the bracts to change colour in time for the winter. At the end of the day we went back into the greenhouse at 4 30 to start the black out period before we left for the night. The greenhouse celling however was set to a timer to allow the light to come in or be blocked out at the same time everyday. To open and close the curtains we had to use hooks that were attached to sticks and drag the curtains across the rail that they were attached to as far as we could. We also had to make sure that there were as few gaps in-between the curtains as possible to keep as much of the light out as we could when we were closeting them.

Walking the crop and watering
Each morning after the shade curtains were open we would walk through the entire crop row by row. Doing this let us see if the crop needs water. On Saturday we walked through the poinsettias and decided that the crop did not need to be water at all and could wait until Sunday. We did notice that not all of the emitters were working properly so we decided to only do some spot watering that day to spot water we filled up a watering can with straight water and took it through the aisles and found any that were still dry. There were also the poinsettia minis that needed to be watered as well. The minis were placed in solid trays and filled with 2 liters of water mixed with the mini poinsettia fertilizer that was a mix of 10-52-10. We waited a half hour to see if the minis soaked up the water through the bottom of the pots and up to the top. When we felt that the soil was wet enough we emptied the water out of the trays and placed the plants back inside them. We also watered the mums inside and outside with the hose and wand. We used the mum fertilizer for both the mums inside the greenhouse and outside.



Pruning
For pruning we had to take all of the stock baskets inside from the compound and brought them inside. We checked the tags on them to see if we had any cuttings in the propagation chamber. If we did have cuttings already we pruned the stock baskets all over and cut them back. Then we placed them on a cart in the potting room. We also had to prune the poinsettia standards so that they looked more round and pleasing to the eyes so that costumers would also like them. To do this we looked at the poinsettias and saw where they were not rounded and found the closest not so that we could make it have the rounded look that it should have.




Pot Cleaning and clean up
There were many pots that had to be cleaned and put away. To do this we just filled a sink up with water and dish soap. Then we would place the pots into the water and wash them out. After they were washed we had to let them dry before we were able to put them away. So we placed them on a cart and staked them so the air could still dry them all out. Washing the pots out was important because if they were not any disease that a plant could have had would still be on the pot when we needed them again. We also had to clean up the potting area when we were done for the day this means any clutter and plant matter had to be off the floor and put where they belonged so that it was easer to find these when we needed them again.

Sales and cash
As we were completing our tasks if a customer came into the greenhouse looking to buy some mums it was our job to help them pick some out and have them pay at the front desk. If they needed help bringing them to their car we would bring them over and place, then in the car. On Saturday we were able to sell 2 large mums and 3 pieces of squash. At the end of the day we also had to get the daily sales from the cash register and make sure that the amount we had in the register matched the amount on the report. When we decided that it all matched up we had to count out $100 for the float for Sunday. Then we put the rest of the profits and placed them in an envelope and locked it away in the drawer.   



After all of this was done on Saturday it was time to lock up the greenhouse making sure that all of the RTV keys were back from the maintenance crew and the radios were on the chargers for the next day.

  Sunday Blog
Lexi Drenth & Brett Blakey

                We got asked to do our weekend duty over September 30-October 2 weekend. There was always stuff for us to do. We got back from a field trip on Friday afternoon so we had less time to complete our tasks. We got asked to do things like organizing the Poinsettia crop, organizing the Mini Poinsettia crop, trimming back the stock baskets, taking inventory of things, and many more. So in the end of things, there was always stuff for us to do.

            When we went into the greenhouse on Sunday morning, we were hoping nothing went wrong over the night while we were not there. By problems I mean the temperature in the greenhouse being less than 13 degrees. The boiler was not on school property getting fixed. So when we made it in there, we signed in and got everything unlocked and then we continued with our opening checklist. Our main jobs in the morning is to walk the crop so we can check every single plant to see if there are any problems at all. Since the last four times the crop was with fertilizer, we did just straight water for the crop. After we watered the crop, we walked around the crop again just to make sure all of the emitters were working. I used the Dosatron to water the crop.

            Once we got all of the crop watered, I washed down the first half of the greenhouse floor, I had to do it right in the morning so the humidity would not get to bad. We separated to do different jobs. I was in the greenhouse, I first re-spaced all of the Mini Poinsettia crop. Then I re-organized the Poinsettia crop. While I was in the greenhouse, Brett was cleaning up the potting room by sweeping, washing pots, bleaching the counters. We stayed apart for a bit to get more work accomplished.


            For closing the greenhouse, we had to do the same thing as opening. We had a checklist to do every morning and every night. On the last night of our weekend shift, is kind of stressful. We had to make sure everything was perfect for our professors to see on Monday morning. When we closed on Sunday, we had to close the till even though we had no sales that day. We closed the curtains and we tried to put more clips on the curtains to fully blackout the greenhouse. We cleaned as much as we could and we made sure everything was watered and organized so the professors wouldn’t come in to a mess. We prioritized our work so we finished all of the important things first.



Fanshawe College Garden Weekend Duty
                During the weekend duty of September 23rd – September 25th many things were accomplished in the woodland garden. Which we consider our horticulture technician backyard. When we arrived on Friday morning at 8am Jeff took us around the Woodland Garden and explained everything that needed to be done within the area. We could have wrote a book with all the tasks. Together, my partner Liam and I decided what main priority was and what was not. We narrowed it down to deciding to maintain the left side large garden. We decided to choose this task as priority because it was the largest and needed the most work. We took the negative and turned it into a positive.
                To begin our much needed make over, we obviously started with the weeding as it was more of a weed bed than a flower bed. Weeding took all of Friday. After the weeding was done, with minutes to spare we decided to prune all the bed flowers off the large grouping of Redbeckia. The hot temperatures leads to watering. At 2pm on Friday I was sent out on the water tank and tractor to water the freshly planted Chrysanthemum’s (Garden Mums). The mums were planted by the summer students (Tawny and Jenn) in the front Oxford and Second Street entrance bed, along with the annual bed by the parking office. During our maintenance class on Wednesday, we were taught how to lay topsoil down and properly seed it for grass growth. On Friday I also had to water the seed to promote germination. Nearing to 5 o’clock I headed back to put the tractors away, while stopping to fill up with fuel. I got Liam to pick me up from C block to start tool clean up. We washed all our used tools from the day with steaming hot water, and headed back to the greenhouse to sign out.
                Saturday morning approached us quickly and we set out to start mulching. Mulching is hard and tedious work but we were up for the challenge. We did the circle check on the RTV 500 and drove to the tool room to get the tools we needed for the day. We then proceeded to drive down to C block to get the tractors and trailer. We set out to the mulch pile near the compound to begin to fill the trailer. After that we headed back up to the Woodland Garden to begin mulching until lunch time. Two trailer loads were required to mulch the bed. After lunch I went out on the water tanker again to water the 42 planters around campus. Almost completing them all in one day minus a few, I ended at 4 to begin putting tractors away. Putting the tractors away was very time consuming as the water tank and trailer have different balls to attach to, meaning I had to change them to put them both away. They had to go in accordingly, almost like a puzzle to fit the tractor with the backhoe on the back which is normally stationed at Cuddy Gardens as our other Kubota tractor is away getting fixed. As I was watering all day Liam finished mulching and began to weed the smaller middle bed.  We then headed for the greenhouse around 5 o’clock, signed out and headed home.

                As Sunday morning approached, we started our day similar to Saturday. Getting the circle check on the RTV 500 and picking out all the tools for the day. As the mulching was finished Saturday we began to finish weeding the smaller middle bed that was a disaster itself. The Spirea has ‘spiraled’ its way into the iris’s which needed to be cleaned up. Like explained above in our maintenance class with Tim we seeded some grass areas. The areas were then staked and had caution tape around them. Since being at a College, of course students overnight had broken the stakes and ripped down the tape. We then fixed the whole area until it looked good as new again. After our first break at 10:30 I went to C block to get the water tanker and finish watering the planters and hit the mum beds up again so they do not wilt. After lunch Liam and I did some of the little jobs around campus like filling up the fuel in the equipment, collecting the water tanker hose, and watering a planter that was not reachable with the tanker because of construction. Lastly we started tool clean up and that was that. Over all we had a very positive successful weekend, that was a huge learning curve. Maintaining gardens is harder than it looks but very satisfying in the end. I am very happy with the end result of our first maintenance weekend duty at the Fanshawe Gardens. 

Tuesday, September 20, 2016



Eric A. & Michael A. Weekend Duty Blog


September 16 – 18, 2016



Friday


We began by walking through the greenhouse, feeling for dry poinsettias and looking for damage to the greenhouse, dead leaves and pests. Ones that were found to be too dry were lightly spot watered. The indoor and outdoorchrysanthemums were then water along with the rest of the outside plants. Next we took apart sections of the dripper system what were not working properly and cleaned out the debris stuck inside them. We then assembled new dripper sections to replace them with and set them up. We pinched the tops of the large poinsettias and removed excess soil from their pots.


Maximum temperature recorded: 23°C




















Saturday


We started the day off the same as Friday, (inspecting the plants and greenhouse) then we started to prune and dust the three planters in front of the bookstore. By mid day we decided to take a break and finish the planters on Sunday so we went back to the greenhouse and set bug traps. After 4 hours we counted the number of pests we caught to monitor their numbers. Water was added to the Priva temperature monitor. We finished up the day cleaning trays, trying to see if we could get the heat pad working, looking for pests and pruning diseased foliage.


Maximum temperature recorded: 25°C










Sunday


First thing we did was finish off the three planters we started the day before. When we returned to the greenhouse to spot water the poinsettias and water the indoor and outdoor chrysanthemums. Poinsettias that were suffering from root rot were taken out of their pots to air dry for part the day. Again we repeated the bug traps but this time they were let up for 6 hours. We tested the poinsettias pH and EC levels with the kit provided in the greenhouse and recorded a pH of 6.7 with EC of 1.6. We noticed the temperature rising to 30 in the greenhouse so we opened up the shade cover. During the last hours of the day we cleaned pots and trays and took out the compost.


Maximum temperature recorded: 30.5°C






















Thursday, June 30, 2016



The Gardens of Fanshawe College


Summer Blog


Blayne D.


June 20-23


Monday


After coming back from a busy week at the Cuddy Gardens, I was happy to be back at the college doing the things I love, working with my other co-workers, greenhouse, mulching and other maintenance. Monday was a hot one! Tawny and I were sent out to mulch around HMF loop. We needed to quickly weed and edge the beds before mulching. Jenn got a few loads of mulch with the tractor and trailer then later helped Tawny and I spread it out. This took us all morning to complete. Alison was busy all day and for the rest of the week watering the outside planters and beds. It was a small group in the afternoon since Dakota and Scott were off while Alison left for the afternoon. It was just me, Tawny, Jenn and Jeff doing interiorscape since the weather was so hot. We hit up the areas at T, B, and outside the bookstore. It had been a while since those planters received some good attention as they needed watering and a major cleanup such as wiping down the leaves from dust, cutting back and cleaning debris. This brought the day to the end, in fact, it was quiet fun!



























Tuesday


As I came back from Cuddy on Monday the greenhouse needed some serious organization and tidying up. I composted any spent plants while we were trying to get the remaining plants in the greenhouse planted outside. That kept me busy all morning. After lunch I went around the greenhouse with Sue to complete the Workplace Safety Inspection for this month. Making sure everything in the greenhouse is in tip top shape. Once that was done I went to continue cleaning plants up and cutting back our stock baskets so they don’t get too overgrown. As we were expecting a couple visitors in the greenhouse the next day, I made sure everything was ready for presentation. Tawny and Jenn planted Coleus and Portulaca in front of Saffrons then moved onto the rocked border garden bed near D building. Petunias and Castor Beans were planted. Continuing on into the afternoon they planted Flowering Maple, Begonias, Cleomes and Coleus in the parking office courtyard.

















Wednesday


In preparation for the visitors coming in today, the greenhouse floors needed a good sweep then I went onto watering then re planting the Chrysanthemums on all the benches. I went by each bench at a time, spacing them and inserting drip lines. This took all morning and into the afternoon. Until lunch time, Tawny, Dakota and Jenn worked on the patio area at Saffrons. Mulching, weeding and tidying up were completed. Tawny and Jenn went to the parking office courtyard to do some maintenance such as pruning, removing tree suckers, weeding, edging, and removing dead wood from a Japanese Maple and a Viburnum. The last thing they did was plant Dusty Miller, Coleus, Portulaca, Begonias and Jacob’s Coat in front of the main doors to the Falcon (R1) residence.













Thursday


Everyone was at their own garden areas to do whatever needed to be done such as edging, planting and weeding. Alison and Tawny tackled Z Building that needed weeding, interorscape and planting done. I was planting up our greenhouse stock baskets and propagated Spider Plant (Chlorophytum comosum) spiderettes that were dangling from the adult plant. While I was getting pictures for this blog a Cornus Kousa (Kousa Dogwood) planted at R3 residence caught my attention. It is used as a stunning flowering tree or large shrub with showy pointed petal-like white bracts.


All in all, I am happy to be back at the college with my fellow co-workers who I enjoy working with so much. Everyday has been jam packed with tasks to get the greenhouse and campus looking the best they can be! Summer has officially begun and I’m looking forward to the remaining of our co-op before I move onto new adventures in the fall!
































The Gardens of Fanshawe College
June 6-10, 2016
Scott P.

From Tuesday (7th of June) until Friday (10th of June), myself and the team of student gardeners were responsible for planting Begonias, Euphorbias, Dusty Millers and fountain grasses, as well as transplanting Hostas, and daylilies.

The north entrance was tilled with peat moss and eventually filled in by myself and Jenn with the Begonias, Dusty Millers and Euphorbias; the red color of the Begonias stands out great with the surrounding green foliage.

The East entrance where the buses enter held several Hostas that were split up and transplanted underneath of the maple outside of the H building entrance. These make a great ground cover and should look far livelier after today’s watering.

The Cheapside entrance held several Daylilies that needed transplanting to the strip of soil behind B Building and between C building (just beside the bike rack). Rebecca, Dakota and I planted these after dividing them up with spades and half-moons, placing them in a staggered formation.

It was a great week of work and we got a fair amount accomplished.